How is the civil construction of a 900MW hydropower plant done?

Thanks! Share it with your friends!

You disliked this video. Thanks for the feedback!

Added by MiAmigo
247 Views
This video shows the civil works of a 900MW hydropower plant in a model, including the excavation of the Dam shoulder excavation、Diversion hole excavation、Interception、Upstream and downstream cofferdam construction、Excavation of foundation pits、First flood、Dam pouring、Second flood、Dam pouring.

Boland is a hydropower equipment company with 60 years of experience that can contract hydropower EM and EPC projects. Boland has one of the top 8 engineering design teams in China.We can provide you with expert technical advice and solution regarding hydroelectric power plant. And we have teamed up with China CRRC. All of China's high-speed rail projects are built by CRRC.
Boland's units have been installed in more than 1000 locations in China and in more than 20 countries abroad, such as Indonesia, Brazil, Cuba, Vietnam, Myanmar, Malaysia and the Philippines.

Please feel free contact us if you need any technical support.
My email:marketing@boland-hydroturbine.com
WA:+8615818539387
Boland’s office website:https://www.boland-hydropower.com/
Boland’s facebook:https://www.facebook.com/bolandhydrogenerator
Thank you!